Resume
2008 – Present Self employed Senior Well Site Supervisor.
My duties as a Senior Well Site Supervisor included:
-Ensure all safety rules and HSE regulations are followed.
-Prepare daily drilling reports, daily cost reports, casing and tubing tallies, etc, as required.
-Responsible for ensuring that contractors are working in accordance with the contracts and meet all contractual requirements.
-Had the authority in the field to represent the company with respect to the implementation of drilling and work-over contracts.
-Supervise the running of completions with tie back stems, open hole and cased hole completions.
-Calculate and supervise all cement jobs, plug back, kick-off plugs, all casing and liner cementing with the different classes of cement, incl. thixotropic cement.
My clients as a Senior Well Site Supervisor included:
-DEEP-KBB, Workover on Caverns (Jemgum, NWKG) and Wells (Rehden) (April 2019 - present)
-Wintershall, Snubbing, Work-over, Completions on Caverns. Drilling and Completions on exploration wells (Sep 2015 - Sep 2017)
-DEEP. Workover on Caverns Etzel (Feb. 2015 – Sep 2015)
-RWE-Dea FBN for Work-over and Completion. Coiled Tubing, Snubbing and Completions. (June 2014 – Feb. 2015)
-Wintershall Holding, Supervisor for Work-over and Completion. (Nov. 2012 – Nov. 2013)
-Gobi Energy Partners LLC, Ulan Bator, Mongolia, Exploration. (Apr. 2012 – Oct. 2012) Supervising the 2012 drilling campaign in Mongolia.
-Central European Petroleum GmbH, Germany, Exploration (Barth and Pudagla) on the Deutag 207 rig. (Mar. 2011 – Jan. 2012)
-Saponis, Poland, Shale gas (Wytowno, Lebork, Starogard) on Nafta Pila rig #15. Was on loan from RAG, Austria. (Sep. 2010 – Sep. 2011)
-RAG, Austria, Exploration and Gas storage (Haidach and Zagling) worked on the ITAG Rigs 110 and 120. (Dec. 2008 – Dec. 2011)
-KBB-UT GmbH in Carriço, Portugal. Gas storage Field. Completions for leeching operations. (Jun. 2008)
-DEEP. Underground Engineering GmbH, Germany, Etzel, Drilling gas storage S-wells. (Mar. 2008 – Dec. 2008)
1998 – 2008 Senior Directional Drilling Supervisor
Worked as a self employed Senior Directional Drilling Supervisor for companies such as:
-Halliburton, Germany, Etzel. (May. 2007 – Mar. 2008) Gas storage field, S-shape wells.
-Halliburton Sperry Drilling, Kazakhstan, Aksai, KPO (Jul. 2006 – Apr. 2007) multi-lateral wells in Karachaganak Field, from a depth of ≈5100 m.
-Halliburton Sperry Drilling, Western Siberia, Salym, (Nov. 2005 – Jun. 2006) SPD, S-shape wells.
-Halliburton, Ukraine, Kiev. (Mar. 2005 – Nov. 2005) Project Coordinator, Odessa Project Offshore Black sea.
-Halliburton Sperry Drilling, Ukraine, Kiev. (Mar. 2005 – Nov. 2005) Representative for sales and services.
-Halliburton, Germany, Etzel. (Jan. 2005 – Mar. 2005) Gas storage field, S-shape wells.
-Baker Hughes Inteq, Western Siberia, Usinsk (Nov 2004 – Jan 2005). Re-entry horizontal.
-Halliburton Sperry Sun, Noyabrsk, (Jul. 2004 – Okt. 2004). Horizontal Drilling.
-Halliburton Sperry Sun, Kingdom of Saudi Arabia. (Apr. 2004 – Jul. 2004) Extended Reach.
-Halliburton Sperry Sun, Canada. (Dec. 2003 – Mar. 2004) Under-balanced extended reach gas wells.
-Halliburton Sperry Sun, Western Siberia, Nizhnivartovsk. (Jun. 2003- Aug. 2003) Superslim Medium Radius, with bi-centre bit.
-European Drilling Services in Heerhugowaard, Netherlands. Offshore Netherlands. (2002 – 2003)
-Burova Technika in Kiev, Ukraine. (2001, 2002 and 2003) Horizontal wells.
-Baker Hughes Inteq in Celle, Germany, (2001, 2002, 2003) Various jobs Horizontal Drilling.
-Sperry-Sun Drilling Services, Netherlands and Germany (2001)
-Inrock Guidance Systems in U.K. (2000 – 2002) Shallow TVD Horizontal Drilling
-Pinpoint Engineering, Netherlands. (2000) Shallow TVD Horizontal Drilling.
-Nacap in Kuala Lumpur, Malaysia. (2003) Shallow TVD Horizontal Drilling.
-Directional Drilling Services, Germany. (1998 - 2000) DD, MWD and Shallow TVD HD. Worked as Directional Driller on the second phase of developing the Gas storage field in Breitbrunn, Germany (All horizontal wells). Was involved on the second test of the Hands-tool from Newburgh Industries, offshore Netherlands for Trans-Canada.
Worked in the Shallow TVD Horizontal Drilling were the main customers were Bohlen & Doyen, Kali & Salz (inside a salt-mine at 800m depth).
1992 – 1998 Sperry-Sun Drilling Services, Beverwijk, the Netherlands.
Worked as MWD engineer, Pressure Gauge Operator and Directional Driller, also worked as a Directional Driller in the Shallow TVD Horizontal Drilling.
1988 - 1992 Sperry-Sun Drilling Services, Dubai, U.A.E.
Worked as a Pressure gauge Co-ordinator and a MWD Engineer both on- and offshore.
1983 - 1988 Sperry-Sun Drilling Services, the Netherlands.
Worked as a Surveyor, Pressure Gauge Operator and as a Directional Driller in the Shallow TVD Horizontal Drilling in various countries in Europe.
1982 - 1983 Dowell Schlumberger, Stavanger, Norway
Worked as a Senior Engineer in Drill Stem testing, Cementing, Fracturing, Acidizing offshore.
1980 - 1982 Dowell Schlumberger, Forsting, Germany.
Worked as a Senior Engineer in Drill Stem testing, Cementing, Fracturing, Acidizing and Well-completion. Was involved in the first thixotropic cement job in Germany.
1979 - 1980 Dowell Schlumberger, Libya
Worked as an Engineer in Drill Stem testing, Cementing, Fracturing, and Acidizing.
-
Dowell Schlumberger, Coevorden, the Netherlands
Started working as a trainee for 3 months before being sent of to the Dowell Schlumberger Training school in Pau, France.
1977 – 1978 Lockwood International, Nieuw-Amsterdam, the Netherlands.
Worked on the prototype department, building and testing prototype packaging machines